YZ-400D Dalian Vibrating Hammer Deployed at Yidu Cold Chain Phase 1, Dalian Port, Liaoning
Date: | Read: 0
YZ-400D Dalian Vibrating Hammer Deployed at Yidu Cold Chain Phase 1, Dalian Port, Liaoning
Owner: Dalian Yidu Group Co., Ltd.
Contractor: Dalian Dajinma Infrastructure Construction Co., Ltd.
Project Parameters
Pile Diameter: 2 meters and 1.60 meters
Pile Length: 18 meters
Wall Thickness: 1 centimeter
Pile Type: Circular Steel Pipe Piles
Embedment Depth: 18 meters
Geological Report: Silt Layer
YZ-400D Hydraulic Vibratory Hammer
Eccentric Torque: 260 kgm
Excitation Force: 4110 kN
Maximum Rotation Speed: 1200 rpm
Maximum Amplitude: 43 mm
Maximum Static Pulling Force: 1600 kN
Maximum Working Pressure: 320 bar
Maximum Oil Flow Rate: 1200 l/min